On Sunday, 16th March 2025, the railway line in Oberes Pustertal/Alta Val Pusteria will be temporarily closed to traffic during the following time slots:
- from 7:30 a.m. to 13:30 p.m. between Bruneck/Brunico and Innichen/San Candido
- from 09:00 a.m. to 12:00 p.m. between Innichen/San Candido and Sillian
The disruption has been scheduled by the infrastructure manager RFI to allow routine inspection and maintenance work to be carried out.
Replacement bus service
A replacement bus service will be provided along the route with the following timetable:
- The B500 replacement bus runs every half hour between Bruneck/Brunico and Innichen/San Candido stations. In Bruneck/Brunico, the replacement bus departs from platform C.
- The SEV223 replacement bus runs hourly between Innichen/San Candido and Sillian.
Replacement timetable B500 Bruneck/Brunico <-> Innichen/S.Candido
Replacement timetable SEV223 Innichen/San Candido <-> Sillian
Bike transport: Not allowed on replacement buses.
Information for people with reduced mobility is available HERE.